Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Random person
Random page
Organizations
Locations
Events
Eras
Tools
All pages
Recent changes
Special pages
Vrienden Universe
Search
Search
English
Appearance
Create account
Log in
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Editing
Raketenstelle Alt-Georgetown
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Site and organization == Werkhof 17 covered 6.8 hectares beside the old Georgetown freight quay. A reinforced basement beneath Speicherhaus 3 held the original archive. Drawing rooms on the floors above produced controlled working copies, which were collected at the end of each shift. Maschinenhalle A contained the pump benches and measured 92 m by 34 m. A separate guidance workshop used isolated foundations to protect its gyroscopes from vibration produced by the machinery hall. A rail spur entered the compound through its eastern gate and carried heavy components to the quay. These arrangements allowed documents to move from the archive to engineering review while completed machinery left through a controlled freight route. The Archiv- und Übersetzungsstelle indexed the German records before releasing drawings to the Konstruktionsbüro. Engineers in that office converted the selected design into dimensions and tolerances available to Tanoan workshops. Prüfgruppe Antrieb tested pumps and combustion components, while Leitwerkstatt Steuerung assembled guidance equipment on vibration-controlled benches. Fertigungslenkung issued the approved production sheets to Patagonia and reconciled returned measurements with the master drawings. The Allgemeine SS guarded the perimeter and inspected outgoing freight. Glöbbery maintained the false identities used by transferred German personnel. Staffing reached 684 in October 1956 as component testing and Patagonian production expanded.
Summary:
Please note that all contributions to Vrienden Universe may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Vrienden Universe:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
This page is a member of 3 hidden categories:
Category:Articles with hatnote templates targeting a nonexistent page
Category:Articles with short description
Category:Pages using infobox mapframe with missing coordinates
Search
Search
Editing
Raketenstelle Alt-Georgetown
(section)
Add languages
Add topic