Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Random person
Random page
Organizations
Locations
Events
Eras
Tools
All pages
Recent changes
Special pages
Vrienden Universe
Search
Search
English
Appearance
Create account
Log in
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Editing
Snubable Enterprise
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
== Organization and facilities == Richard Rambam led Snubable Enterprise from its foundation until 1 May 2025. Its workforce combined biological researchers with industrial and administrative employees. Security personnel controlled access to restricted sites and enforced internal discipline. A separate personnel list records the people known to have worked for the organization or exercised direct authority over it.<ref name="personnel"/> === Main complex === On 18 August 2007, intermediaries working for Snubable Enterprise secured a disused metal-processing factory on an industrial parcel at Căciulați, north of Bucharest. The property had road and utility access but was sufficiently isolated to conceal activity at the site. Its exterior remained in deteriorated condition, with weathered brickwork, a patched roof and minimal signage. The interior was rebuilt for biological production. Filtered ventilation and sealed laboratory corridors were installed. Concealed freight lifts connected reinforced production halls to an underground complex of processing chambers, tunnels and technical galleries. Gustav Shrankenhaus joined Snubable Enterprise as chief architect in 2008 and designed the underground factory areas and the tunnel system connecting its three properties.<ref name="gustav-snubable"/> The first underground production block was completed on 11 February 2008. A deep-level maturation wing entered service on 29 September. By the end of the year, internal records stated that approximately 8,000 to 10,000 clones had been produced through the earlier facilities and transitional sites. Rambam then set a target of producing hundreds of clones per day. A western annex completed on 16 April 2011 housed nutrient synthesis and the preparation of synthetic amniotic fluid. It also contained equipment-maintenance space. The November 2015 expansion added a generator hall and opened additional perimeter tunnels. A reinforced lower technical section was constructed for heavier incubation equipment and future hybrid research. === Other properties === Snubable obtained control of warehouse and logistics space at the [[FI-BA Balotești S.A.]] industrial site at Șoseaua Unirii 145 in [[Balotești]] on 4 April 2009. The property stored material and staged deliveries moving between Snubable facilities. It remained separate from the main production complex. Construction of a concealed tunnel between the main factory and the FI-BA warehouse began on 12 June 2009. The first section entered service on 3 November 2011. An extension to the [[Alexandru Dimitrie Ghica Palace]] at Căciulați was completed on 21 May 2013. The completed network allowed movement between the three properties without using their visible road entrances. The public administrative office in Bucharest was not connected to the tunnels.<ref name="gustav-snubable"/> Snubable acquired the Alexandru Dimitrie Ghica Palace through an unnamed front company on 17 September 2010. Corrupt political officials altered records governing the palace's administration and heritage status. They also changed sale documents to conceal Snubable's control of the property. The palace and its park became a protected meeting venue for senior figures from Snubable Enterprise and the Bucharest Butchers. Snubable made limited repairs and security alterations so that the site continued to appear neglected and institutionally administered. === Security and administrative cover === On 27 August 2007, Rambam met Legion Commander [[Constantin Vlădescu]] at the main complex. They agreed that rotating [[Secția Roșie]] detachments would guard the perimeter. The detachments escorted sensitive deliveries and intervened during attempted inspections. The arrangement remained under Bucharest Butchers authority.<ref name="vladescu-snubable"/> Snubable opened its public administrative office in Bucharest in 2010. [[Mihai Dobreanu]] joined that year after working in construction authorization in Ilfov County. He became Site Coordination Manager in 2012. Rambam appointed him Director of External Operations in 2015, after which Dobreanu secured and concealed properties outside the main factory complex.<ref name="dobreanu-snubable"/> Romanian authorities knew of activity connected to Snubable Enterprise but did not subject its main sites to normal enforcement. Properties registered as warehouses or agricultural storage sites were not fully inspected despite restricted access and unusually high energy use. Complaints about construction and industrial noise did not result in searches. Land-use approvals and construction permits continued to be processed for Snubable properties. Documents recovered after the collapse showed that the registered purposes of some sites did not match the work conducted there. After Jibbut Snagov stopped reporting to the organization in December 2024, Albert Shrankenhaus was appointed head of security at the main facility in early 2025 because no other candidate was available. The appointment gave him authority over that facility's defenses but did not make him security chief of Snubable Enterprise as a whole.<ref name="albert-snubable"/>
Summary:
Please note that all contributions to Vrienden Universe may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Vrienden Universe:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
This page is a member of 2 hidden categories:
Category:Articles with short description
Category:Pages using infobox mapframe with missing coordinates
Search
Search
Editing
Snubable Enterprise
(section)
Add languages
Add topic