Jump to content
Main menu
Main menu
move to sidebar
hide
Navigation
Main page
Random person
Random page
Organizations
Locations
Events
Eras
Tools
All pages
Recent changes
Special pages
Vrienden Universe
Search
Search
English
Appearance
Create account
Log in
Personal tools
Not logged in
Talk
Contributions
Create account
Log in
Editing
Snubable Enterprise
(section)
Page
Discussion
English
Read
Edit
Edit source
View history
Tools
Tools
move to sidebar
hide
Actions
Read
Edit
Edit source
View history
General
What links here
Related changes
Page information
Appearance
move to sidebar
hide
Warning:
You are not logged in. Your IP address will be publicly visible if you make any edits. If you
log in
or
create an account
, your edits will be attributed to your username, along with other benefits.
Anti-spam check. Do
not
fill this in!
=== Main complex === On 18 August 2007, intermediaries working for Snubable Enterprise secured a disused metal-processing factory on an industrial parcel at Căciulați, north of Bucharest. The property had road and utility access but was sufficiently isolated to conceal activity at the site. Its exterior remained in deteriorated condition, with weathered brickwork, a patched roof and minimal signage. The interior was rebuilt for biological production. Filtered ventilation and sealed laboratory corridors were installed. Concealed freight lifts connected reinforced production halls to an underground complex of processing chambers, tunnels and technical galleries. Gustav Shrankenhaus joined Snubable Enterprise as chief architect in 2008 and designed the underground factory areas and the tunnel system connecting its three properties.<ref name="gustav-snubable"/> The first underground production block was completed on 11 February 2008. A deep-level maturation wing entered service on 29 September. By the end of the year, internal records stated that approximately 8,000 to 10,000 clones had been produced through the earlier facilities and transitional sites. Rambam then set a target of producing hundreds of clones per day. A western annex completed on 16 April 2011 housed nutrient synthesis and the preparation of synthetic amniotic fluid. It also contained equipment-maintenance space. The November 2015 expansion added a generator hall and opened additional perimeter tunnels. A reinforced lower technical section was constructed for heavier incubation equipment and future hybrid research.
Summary:
Please note that all contributions to Vrienden Universe may be edited, altered, or removed by other contributors. If you do not want your writing to be edited mercilessly, then do not submit it here.
You are also promising us that you wrote this yourself, or copied it from a public domain or similar free resource (see
Vrienden Universe:Copyrights
for details).
Do not submit copyrighted work without permission!
Cancel
Editing help
(opens in new window)
This page is a member of 2 hidden categories:
Category:Articles with short description
Category:Pages using infobox mapframe with missing coordinates
Search
Search
Editing
Snubable Enterprise
(section)
Add languages
Add topic